Breaking News:-

Power Shutdown

SRINAGAR: According to the Chief Engineer, JKPTCL Kashmir, in order to carry out the work of increasing ground clearance of the bottom conductor of both circuits on 132 KV D/C Amargarh-Kupwara Transmission line between the location no. 09 & 10 at Badambagh Sopore and to tighten the loose earth wire between tower location no. 103-104 Nutnussa Kupwara, the power supply to Handwara, Zachaldara, Magam, Dolipora, Kralpora, Tangdhar, Keran, Machil, Lolab, Khumeriyal, Chogal, Panzgam, Karihama, Trehgam, Hyhama,Tarathpora, Vilgam, Sogam, Divar, Krusen, DC Residence/office, Drugmulla, and Phuropeth will remain affected from 09:00 AM to 01:00 PM and 12:00 Noon to 06:00 PM on 19 July, 2025.

Fast, accurate and updated real time local news is available on your smartphone and tablet.
STAY CONNECTED EVERYWHERE YOU GO!

Author

Jammu Links News